How to work out your hourly rate as a cabinetmaker

11 October 2026 · 6 min read

Ask ten cabinetmakers what they charge an hour and you'll get ten answers, and most of them started as "whatever the shop down the road charges". The trouble is the shop down the road has different wages, rent, machines and crew. Their rate tells you nothing about yours.

Your charge-out rate should come from your own numbers: what it really costs to keep the doors open for an hour, plus the profit you want. Here's how to work it out, step by step.

1. Work out what each person really costs

Wages are only the start. For every employee, add up a full year of:

  • Pay at their actual rate (at least the award: most cabinetmaking shops fall under the Joinery and Building Trades Award).
  • Super, at the super guarantee rate (12% of ordinary time earnings from 1 July 2025).
  • Workers' compensation insurance, from your premium notice.
  • Paid leave: four weeks' annual leave, sick and carer's leave, and public holidays. You pay for these weeks, but nobody is building cabinets in them.
  • Training: TAFE days for apprentices are paid days away from the bench too.

2. Count the hours you can actually bill

This is where most rates go wrong. A 38-hour week is not 38 billable hours. Take out leave and public holidays, then the hours that never make it onto a job: sweeping up, sharpening, machine maintenance, picking up stock, rework and waiting on site. Most shops lose 10 to 20 percent of their working hours this way.

Divide each person's yearly cost by their billable hours, and you have what an hour of their time really costs you.

3. Add your overheads

Everything the business pays for that isn't wages: rent, power, insurance, the ute and its fuel and rego, finance on the CNC or edgebander, tool replacement, software, phone, accounting, advertising, and the hours you spend quoting and doing the books. Add up a year of it and spread it across all the billable hours in the shop.

If you're buying machines, talk to your accountant about how they're depreciated (the ATO's instant asset write-off rules can change the tax picture). For pricing, what matters is that the machine's cost is covered over the years you'll use it.

4. Break-even, then profit

Labour cost per billable hour plus overheads per billable hour is your break-even rate. Charge that and you pay everyone and everything, and make nothing. Your wage as the owner is a cost; profit is what's left after it, and it's what pays for the next machine, the quiet month and the job that goes wrong.

To build in a profit margin, divide break-even by (1 − margin). For a 20% margin, divide by 0.8. Don't just add 20%: that gives you a smaller margin than you think.

A worked example

These figures are made up to show the method, not a guide to what you should pay or charge.

  • Two tradespeople, each paid $38 an hour for 38 hours a week: $75,088 a year each.
  • Add 12% super ($9,011) and 1.5% workers' comp ($1,126): $85,225 a year each.
  • Take out 4 weeks' annual leave, 2 weeks of sick leave and 2 weeks of public holidays: 1,672 working hours. Lose 15% to cleaning, maintenance and rework: about 1,421 billable hours each.
  • Labour cost: $85,225 ÷ 1,421 = about $59.97 per billable hour.
  • Overheads of $60,000 a year across both people's 2,842 billable hours: about $21.11 an hour.
  • Break-even: about $81.08 an hour. For a 20% margin: $81.08 ÷ 0.8 = about $101.35 an hour.

If this shop charged $95, it would feel healthy, but its real margin would be under 15%, and one slow month would wipe it out. That's the gap guessing leaves.

5. Check it every year

Award rates usually go up on 1 July, and super, rent and insurance creep up too. Rework the numbers at least once a year, and whenever you hire, lose someone or buy a big machine. If you're still pricing from a spreadsheet, see the signs you've outgrown it.

Cabinetmaker hourly rate: how to work it out — Benchline